Search Site

Trends banner

Tesla’s first Saudi showroom opens

The opening in Riyadh comes with Tesla sales dropping.

Mubadala Energy enters US energy market

Acquires a 24.1% interest in US firm Kimmeridge’s SoTex

Borouge to increase dividend from 2025

The company okayed $650 million final dividend for 2024.

TikTok’s US future uncertain

It must find non-Chinese owner to avoid ban.

Tesla Q1 sales sink 13 percent

The dip occurred amid lower production during factory upgrades.

ACWA Power starts commercial ops at phase 2 of Dubai’s Noor Energy

The project is part of Phase four of the MBR Solar Park in Dubai, (WAM)
  • The second phase is part of a 950 MW solar CSP independent power project, the company said .
  • The financial impact from the full capacity (950 MW) is expected to show starting from the first quarter 2024.

RIYADH, SAUDI ARABIA – ACWA Power Co  said it received the initial commercial operation certificate from the Dubai Electricity & Water Authority (DEWA) for phase two of concentrated solar power (CSP) Parabolic Trough (PT) 200 megawatts (MW) unit of Noor Energy 1, taking total capacity under operation to 717 MW.

The second phase is part of a 950 MW solar CSP independent power project, the company said in a statement on Tadawul.

The financial impact from the full capacity (950 MW) is expected to show starting from the first quarter 2024.

The project is part of Phase four of the MBR Solar Park in Dubai, UAE. ACWA Power owns a 25 percent stake in Noor Energy 1.