Search Site

Trends banner

‘Wadeem’ sold out for $1.49bn

This is the highest Abu Dhabi real-estate release to date.

Tesla Q2 sales down 13.5%

Shares rally after the disclosure, better than some forecasts.

TomTom cuts 300 jobs

The firm said it was realigning its organization as it embraces AI.

Aldar nets $953m in sales at Fahid

Aldar said 42 percent of the buyers are under the age of 45.

Qualcomm to Alphawave for $2.4 bn

The deal makes Alphawave the latest tech company to depart London.

LG Chem to build plant in US

US Treasury Secretary Janet Yellen (R) is briefed by LG Chem CEO Shin Hak-cheol at the LG Science Park in Seoul. (AFP)
  • LG Chem said the plant will be capable of producing 120,000 tonnes of cathodes a year by 2027, enough to power 1.2 million pure electric vehicles
  • Cathode, a key component in rechargeable batteries, is made up of nickel, lithium and other materials, and comprises around 40 percent of the cost of electric vehicle batteries

Seoul, South Korea— South Korea’s LG Chem signed an agreement with the US state of Tennessee to build a $3.2 billion cathode materials plant for electric vehicle batteries, the company said Tuesday.

The plant will be capable of producing 120,000 tonnes of cathodes a year by 2027, enough to power 1.2 million pure electric vehicles, LG Chem said in a statement.

Covering 1.7 million square meters (420 acres), the facility will be the “largest of its kind in the United States”, it added.

Cathode, a key component in rechargeable batteries, is made up of nickel, lithium and other materials, and comprises around 40 percent of the cost of electric vehicle batteries.

Tennessee was the “best choice” for LG Chem owing to its “proximity to key customers”, ease of transporting raw materials and active government cooperation, the company said.

“The Tennessee facility allows LG Chem to proactively address the changing dynamics of the global battery material market and with legislation such as the Inflation Reduction Act (IRA).”

The IRA, signed into law by US President Joe Biden in August, requires certain percentage of critical minerals used in EV batteries to be from the United States or its free trade partners.

Construction of the plant will begin next year, with mass production set to start in 2025.

The Tennessee site will “play a critical role” in LG Chem’s strategy to increase its battery materials business including cathode material fourfold from 5 trillion won ($3.7 billion) in 2022 to 20 trillion by 2027, the company said.