Search Site

Trends banner

Oracle shares up 35%

Huge AI contracts lead to the surge.

ADCB to raise $1.66bn

The rights issue aimed at boosting growth.

EGA H1 revenue $4.11bn

Net profit before GAC $445 million.

Borouge to pay $660m H1 dividend

Its net profit for H1 was $474 million.

TAQA secures $2.31bn loan

It will be utilized in a phased manner.

Dewa, Stanford to build PV system at Al Maktoum Solar Park

Employees walk past solar panels at the Mohammed bin Rashid Al-Maktoum Solar Park on March 20, 2017, in Dubai.
    • Dewa will reportedly use its Space-D program to build this system at the park that has a planned capacity of 5,000MW by 2030

    • The new system is expected to reduce errors in the forecast to less than 10%

    Dubai Electricity and Water Authority and Stanford University will collaborate to develop an advanced system to forecast photovoltaic or PV production at the Mohammed bin Rashid Al Maktoum Solar Park, said local reports on Friday, July 23.

    Dewa will reportedly use its Space-D program to build this system at the park that has a planned capacity of 5,000MW by 2030.

    The new system is expected to reduce errors in the forecast to less than 10%, the reports quoted Dewa as saying in a statement.

    This will support the utility’s efforts to achieve the Dubai Clean Energy Strategy 2050 to provide 75% of Dubai’s total power capacity from clean energy sources by 2050, said the reports.

    The system will apparently use technologies such as artificial intelligence, deep learning, high-density cameras on the main satellite, and a network of metrological stations to predict irradiance, dust and cloud movement, which can affect PV performance.

    Dewa MD and CEO Saeed Mohammed Al Tayer was quoted by the reports as saying: “We are collaborating with Stanford University at Dewa’s R&D Centre through our membership in the Energy 3.0 program from the university.”