Search Site

Trends banner

Ozempic maker lowers outlook

The company posted tepid Q3 results.

Kimberly-Clark to buy Kenvue

The deal is valued at $48.7 billion.

BYD Q3 profit down 33%

This was a 33% year-on-year decrease.

Alphabet posts first $100 bn quarter

The growth was powered by cloud division buoyed by AI

Nvidia to take stake in Nokia

Nvidia share price soars 20%.

ACWA Power starts commercial ops at phase 2 of Dubai’s Noor Energy

The project is part of Phase four of the MBR Solar Park in Dubai, (WAM)
  • The second phase is part of a 950 MW solar CSP independent power project, the company said .
  • The financial impact from the full capacity (950 MW) is expected to show starting from the first quarter 2024.

RIYADH, SAUDI ARABIA – ACWA Power Co  said it received the initial commercial operation certificate from the Dubai Electricity & Water Authority (DEWA) for phase two of concentrated solar power (CSP) Parabolic Trough (PT) 200 megawatts (MW) unit of Noor Energy 1, taking total capacity under operation to 717 MW.

The second phase is part of a 950 MW solar CSP independent power project, the company said in a statement on Tadawul.

The financial impact from the full capacity (950 MW) is expected to show starting from the first quarter 2024.

The project is part of Phase four of the MBR Solar Park in Dubai, UAE. ACWA Power owns a 25 percent stake in Noor Energy 1.